Transport and Infrastructure

Connecting journeys and livelihoods

Roads, buses, boats, rail and ports form connected journeys rather than isolated projects.

An MSC container ship and a small tug seen through coconut palms near Vizhinjam.
An MSC container ship arriving at Vizhinjam, 5 October 2024. Hobbywriterae · CC0 1.0 · Resized for display.
Read the chapter overview

The report covers roads, buses, rail-linked urban mobility, ports and inland waterways as a connected transport system. State land-acquisition support, Union responsibilities and multiple delivery agencies are relevant to attribution. Many programmes remain partly completed.

The transport strategy treats road safety as a public-health priority and describes institutional action through the Road Safety Authority.

Transport infrastructure

Roads, buses, urban rail, ports and waterways form a connected system. Projects involve State, Union and multiple agencies, and many programmes remain only partly complete.

Road safety as a public-health priority

The transport strategy treats road safety as a public-health priority and describes institutional action through the Road Safety Authority.

KIIFB project disbursements

KIIFB disbursed ₹34,824 crore for projects during 2016–17 to 2024–25. Disbursement differs from approved project value and completed asset value.

PWD roads upgraded to BM/BC standard

PWD reported BMBC upgrading of 11,666 km of roads during 2016–2025. This is cumulative upgrading, rather than newly created road length.

Roads and bridges expenditure

Reported cumulative state expenditure on roads and bridges was ₹24,577 crore during 2016–17 to 2024–25.

Vizhinjam container throughput

Vizhinjam reported cumulative throughput of 13,13,609 TEU by 30 November 2025. TEU measures container capacity in twenty-foot-equivalent units.

Kochi Metro’s completed phases

The March 2026 Planning Board report describes Kochi Metro Phases I, IA and IB as completed. This is not a later live-status update.

Kochi Metro Phase II: the December 2026 forecast

The March 2026 report forecasts the 11.2-km Kochi Metro Phase II from JLN Stadium to Infopark by December 2026. This source does not establish completion.

Kochi Metro Phase III: a proposal awaiting approval

In March 2026, the report describes a proposed 14-station Kochi Metro Phase III from Aluva to Angamaly, awaiting Union approval.

Water Metro operations began in April 2023

Kochi Water Metro began operations in April 2023, according to the Planning Board report.

Water Metro routes and annual ridership

Water Metro’s serviced distance rose from 8.7 km to 25.1 km and annual ridership from 18 lakh to 21 lakh between 2023–24 and 2024–25. These are not full-network or lifetime totals.

Vizhinjam’s trial and commercial operations in 2024

Vizhinjam trial operations began on 12 July 2024; the report dates commercial operations to 3 December 2024. These are separate milestones.

Vizhinjam’s cumulative traffic by November 2025

By 30 November 2025, Vizhinjam reported handling 1,313,609 twenty-foot-equivalent units from 611 vessels. These capacity-equivalent units are not individual container counts.

The report’s account of state spending on VISL

The report records ₹1,475 crore of State spending on VISL. It supplies no separate exact cutoff for this cumulative amount.

The proposed Vizhinjam–Kollam–Punalur growth triangle

The March 2026 report describes the Vizhinjam–Kollam–Punalur growth triangle as a concept for future implementation through KIIFB, not a completed project.

State support for national-highway land acquisition

The report describes Kerala paying 25% of national-highway land-acquisition costs with the Union government. This is not 25% of total construction costs.

Seven completed NH66 widening stretches

The March 2026 report describes seven NH66 widening stretches as completed, not the entire highway. It gives no named stretch inventory or exact cutoff here.

Hill Highway projects: completed and ongoing

On 31 March 2025, five of 47 KIIFB-funded Hill Highway projects were completed and 42 ongoing. These project counts do not describe completion of the entire highway.

Coastal Highway projects: completed and ongoing

On 31 March 2025, one of 40 KIIFB-funded Coastal Highway projects was completed and 39 ongoing. These are project counts, not kilometres or full-route completion.

Hill Highway: completed and developing sections

The government reports 473.42 km completed of a 1,179.45-km Hill Highway, with 793.68 km separately described as under KIIFB development. The lengths may overlap.

Coastal Highway: approval and early completions

The government reports approval for 605 km of Coastal Highway, with 507.865 km under KIIFB development and three stretches completed. Completed-stretch lengths are unstated.

Wayanad tunnel: a construction milestone

Approvals were obtained and construction inaugurated for the Anakkampoyil–Kalladi–Meppadi route, according to the report.

Vizhinjam: the next phases

The report advances the target for subsequent phases from 2045 to 2028. This is an expansion target, not completed work.

Perumbalam bridge opened

The government reports the Perumbalam bridge in Alappuzha completed and opened for island residents. It gives no exact opening date or beneficiary count.

A bridge serving the Amboori tribal area

The government reports the Kumbichalkadavu bridge completed and opened to improve access to the Amboori tribal area. Travel-time savings are not quantified.

State land support and an NH 66 stretch

The government reports Kerala’s 25% share of NH66 land-acquisition costs and completion of Talapady–Chengala. NHAI implements the highway; this is not full-route completion or a 25% share of all construction.

Road upgrading over the decade

The government reports 18,000 km of PWD’s 29,573-km network upgraded over ten years. The account does not specify a single BM/BC or other technical standard.

Maintenance under running contracts

The government reports 20,000 km under running-contract maintenance. This is not new-road length and may overlap with upgraded roads.

Alappuzha–Changanassery road made traffic-ready

The government reports the semi-elevated Alappuzha–Changanassery highway completed and usable for traffic. Cost, length and measured travel-time savings are not supplied.